Reply To: Project CAPEX

  • Ryan

    Organizer
    10 May 2024 at 12:56 pm

    There’s considerable variation between project costs, with many factors influencing the total CAPEX of a project. In addition, often low CAPEX technologies result in a higher OPEX, which requires it’s own considerations. In BiogasWorld’s report on best practices for reducing the costs of bigoas production, some costs are analysed for various projects: https://biogasworld-5799596.hs-sites.com/ad-costs-eccc